Skip to content
V.021 · solo designer + 4 partner crews · year 12

A home to live in long,
made over
slowly.

A year-12 solo designer with four partner crews (carpentry, paper, tile, wiring, paint).
Four categories: full remodel, partial remodel, home styling, commercial space.
First consult is free (1 hr · at the office or over video).

On site now
Full___ home___ py · 60% done
Partial___ home___ py · 90% finishing
Commercial___ shop___ py · 30% done
Styling___ home___ py · handed over
Full___ home___ py · quoting
Full___ home___ py · 60% done
Partial___ home___ py · 90% finishing
Commercial___ shop___ py · 30% done
Styling___ home___ py · handed over
Full___ home___ py · quoting
* On-site rows are editable fields · refreshed weekly
* Quote → application form / Portfolio → built-work gallery

4 service categories · quote by pyeong

Four categories plus a by-pyeong quote estimate. The real quote follows the first consult, with area, materials, and design talked through (detailed quote within 5–7 business days).

Quote guide by pyeong
PyeongFull remodelTime
10 py (33㎡)estimated KRW ___1.5 mo
20 py (66㎡)estimated KRW ___2 mo
30 py (99㎡)estimated KRW ___2.5 mo
40 py (132㎡)estimated KRW ___3 mo
50 py+by quote3 mo+
Straight from your pyeong
Material grade
Estimated quoteKRW 5,0400,000
* Estimated quote — the real one follows the first consult with area, materials, design, and overhead (within 5–7 business days)

Portfolio — built work

12–16 built projects. Hover a card to slide between before and after. All posted with client consent.

24 py · 2025-01-08 · Hwagok-dong
Flooring · Paper · Tile · Paint
32 py · 2025-01-11 · Mok-dong
Bath · Tile · Paint
18 py · 2025-01-14 · Yeonnam-dong
Paint · Lighting
28 py · 2024-01-17 · Mangwon-dong
Furniture · Lighting
36 py · 2025-01-20 · Sinjeong-dong
Flooring · Paper · Tile
42 py · 2024-01-23 · Deungchon-dong
Flooring · Paper · Tile · Paint
* Posted with client consent · identity and address withheld · only pyeong, year, materials shown

Build in 7 steps

Consult → measure → quote → contract → demolition → build → handover. 1.5–3 months on average.

01Consult

At the office or over video. We hear the home, the lifestyle, the budget, the timeline.

1 hr · free
02Site Measure

An on-site measure of walls, windows, wiring, plumbing. Furniture list and a scaled drawing.

1–2 days
03Detailed Quote

The 4-dimension materials picker, design, and overhead, totaled into one quote.

5–7 days
04Contract

A contract covering quote, schedule, materials, and warranty. First payment (deposit ___%).

same day
05Demolition

A partner demolition crew. Waste cleared and a safety check.

3–7 days
06Build

Carpentry, papering, tile, wiring, paint — 4–5 crews in order. Weekly photo reports.

1–2 months
07Handover

A clean home, a usage guide, a warranty. Final payment. Furniture reset.

1–2 days
* 1.5–3 months on average · varies by area, materials, schedule · the studio checks every step

Materials in 4 dimensions

Flooring 4 · wall 4 · tile 4 · paint 4. Combine freely → fills the quote materials for you.

Flooring · 4
Wall finish · 4
Tile · 4
Paint · 4
Materials I picked
Flooring___
Wall finish___
Tile___
Paint___
* Materials picker sample — the real quote follows the first consult, by grade and area

Designer OnOO + partner crews

A year-12 solo designer. 5 years in architecture + 5 in interiors → went solo in 2022 with four partner crews.

About

___ (designer bio input sample — year 12 in interiors + architecture background, went solo 2022, ___ homes a year, facts-first).

Five years at an architecture office, five at an interior design firm. Drawing the plan wasn’t enough; I went solo because I liked drawing, with the client, how their ___ daily life could ___ change.

___ (closing) Owning one home for 1.5–3 months is ___ . I work with crews that started small and stayed long.

A word from the designer

___ A good home isn’t made in one go, I think. Living in it, reworking it, living in it again — passing through that slow ___ process together is my work.

O— Designer OnOO · solo since 2022
Partner crews
1
___ Carpentry crew
___ years of trade · ___ months together. Furniture, structure, floors.
___ homes together
2
___ Papering crew
___ years of trade · ___ months together. Wall finishes and paint.
___ homes together
3
___ Tile & bath crew
___ years of trade · ___ months together. Bath, kitchen, floor tile.
___ homes together
4
___ Electrical crew
___ years of trade · ___ months together. Wiring, lighting, automation.
___ homes together
5
___ Paint crew
___ years of trade · ___ months together. Low-VOC paint, exposed concrete.
___ homes together
* The designer checks every build · responsibility sits with one brand · crew info kept open

How it runs

Four core principles — contract, warranty, schedule, cancellation. Full terms are in the footer policy links.

C
Contract
Quote, schedule, materials list, and warranty all spelled out. Deposit ___%, interim ___%, balance at handover.
Korea standard interior contract
W
Warranty
One year of free defect cover after the build (structure, wiring, plumbing). Wear and everyday marks excluded. Send a photo and text — a visit within 3 business days.
Free rework if it’s a defect
S
Schedule
A schedule is fixed at signing. Outside factors — supply, neighbor consent, weather — are adjusted in ___-day steps by agreement. Weekly photo reports.
Written reason and remedy if delayed
X
Cancellation
100% before demolition; after demolition starts, materials and labor are deducted. If the studio cancels, 100% plus a penalty.
Refund within 7 business days

Frequently asked

Quote, schedule, materials, defects, living during the build, and more — six in all.

At the office (Hwagok-dong, Gangseo-gu, Seoul) or over video — Zoom, Google Meet, or Kakao. One hour, hearing the home, lifestyle, budget, and timeline. After you apply, available times come back within 1–2 business days.

A detailed quote within 5–7 business days — one document covering the measure, the four material dimensions, design, and overhead. After that the talk is open; you decide when to sign.

A partial remodel (bath or kitchen only) allows partial stay; a full remodel does not — it isn’t livable. Temporary stay costs (hotel, family) sit outside the quote, though we can talk them through.

Yes — combine the four dimensions freely in the picker, or borrow samples for a week after the first consult and decide by hand. You can buy materials yourself too, though those fall outside the build warranty.

One year of free defect cover. Photo and text, a site check within 3 business days, free rework once confirmed. Wear and everyday marks aren’t covered. After a year it’s paid (a visit fee of KRW ___ plus materials and labor).

All 4–5 crews have worked directly with the designer for at least ___ months. Build responsibility sits with the single designer brand — you contract with one person. Crew details are open in the section above.

Apply: quote or consult

First consult / formal quote / quick question — 3 tracks, toggled in one form.

Consult method